Large USVs - First operational experience
2025 is a major year for Massterly. Within this year, the first of the officer roles will be transformed, as the chief engineers of three short sea logistic vessels will merge in the Remote Operations Center. Simultaneously, we take on management and operation of two large remote-controlled USV's built with no accommodation or bridge. After the first months of operation, what are the experiences of the captain, dynamic positioning officer and the chief engineer? Join us for some insight into remote operations, from an operator's perspective.